Power shutdown

  • 7
    Shares

SRINAGAR: According to the Power Controller, Kashmir Province, PDD Bemina, Srinagar, in order to carry out twining, laying of conductor of Ahmadpora Magam Beerawah line, necessary stabilization and to carry out branch runing/cutting of trees, the 33 KV line of Kulgan-Devsar, Kulgam  Yaripora, shall remain turned off on May 12 and 13 from 9 am to 5pm.
Also, 33 KV lines of Rawalpora Rangrate, Rawalpora Airforce, and Ahmadpora Magam Beerwah shall remain turned off on May 14 from 9am to 4pm and May 12, 13 and 14 from 10 am to 5 pm respectively.
Accordingly, shutdown of 33 KV lines of Habak-BAMK shall be taken on May 14 and Habak ZakuraBurzhama, Habak Hazratbal, Habak Lal Bazar on May 13. Also, shutdown is also scheduled for Wanganpora BAMK, Wanganpora Khanyar, on May 15 and 33 KV line Wanganpora Soura on May 16 from 9 am to 6 pm.
Power supply to areas fed from these receiving stations shall remain affected on the said dates and times.

Leave a Reply

Your email address will not be published.